Wednesday 2 November 2016

Typeface in context - Production Schedule

Week 1

10/10 Write intro for the book. Keep working on it in the upcoming days.

11/10 Book the printing slot for the 28th of october, so I have one more week to take pictures and correct mistakes.

12/10 Attend to the foiling, flocking, embossing and debossing induction.

13-15/10 Correction of images just to give them a more professional look. Nothing that makes them look interesting.

16/10 Mock up the binding method that is potentially going to be used.


Week 2

17/10 Use a big paper in studio to identify what size for the book is going to work best.

18/10 Start In-Design project and find out how to print something for a sandwich binding publication.

19/10 Attend to the bookbinding refresh induction. Ask about how to make a hard cover for a sandwich binding and see if the current idea can be improved.

20/10 Do a new mock up with the stock from GF Smith and order new stock for another mock up and the publication. (Stock from GF Smith didn't arrive)

21/10 -Busy at Broadening horizons workshop-

22/10 Design the cover of the book and find a right system of grids and layout

23/10 With a mock up, identify the central pages for the two panoramic images in the book.


Week 3

24/10 Prepare the screen to screenprint the cover once the book is finished. Book lasercut induction for new idea (out of time, 9th of November)

25/10 Create a final mock up. Try drawing the letters

26/10 By this point the book should be finalised and small details should be polished

27/10 Have book ready to be printed out and screen to screenprint the cover.

28/10 Consider Feedback and apply it


Week 4

31/10 Prepare screen for screenprinting and collect the stock

1/11 Print final version and stitch it

2/11 Make book and screenprint cover

3/11 Finalise details

No comments:

Post a Comment